Showing 1 - 3 of 3
The V-Model, in the sense of a V-shaped software process model, was first introduced in 1979 by Boehm as a sequential process model with particular emphasis on the validation and verification of the results. About ten years later, work began in Germany on the V-Model standard which has by now...
Persistent link: https://www.econbiz.de/10012422181
Persistent link: https://www.econbiz.de/10004367162
The V-Model, in the sense of a V-shaped software process model, was first introduced in 1979 by Boehm as a sequential process model with particular emphasis on the validation and verification of the results. About ten years later, work began in Germany on the V-Model standard which has by now...
Persistent link: https://www.econbiz.de/10012427394