Showing 1 - 1 of 1
This study addresses a two-stage flowshop with a batch machine in stage 1 and a discrete machine in stage 2, subject to the constraint that the input buffer of the discrete machine can only host limited number of jobs. The batch machine processes a batch of jobs simultaneously, and the discrete...
Persistent link: https://www.econbiz.de/10008490591