Showing 1 - 2 of 2
In this paper we present a heuristic method, based on Lagrangian relaxation, for multilevel lot-sizing when there is a single bottleneck facility. A series of Lagrangian relaxations (one for each item in the product structure) is imbedded in a branch and bound procedure. The objective is to find...
Persistent link: https://www.econbiz.de/10009203846
Industrial lotsizing and scheduling pose very difficult analytical problems. We propose an unconventional model that deals with sequence-dependent setup costs in a multiple-machine environment. The sequence-splitting model splits an entire schedule into subsequences, leading to tractable...
Persistent link: https://www.econbiz.de/10009191105