Showing 1 - 5 of 5
The conventional approach to the assembly line balancing problem assumes that the manufacturing methods to be used have been predetermined. However, in practice the design engineer has several alternatives available in the choice of processing, typically involving a trade-off between labor or...
Persistent link: https://www.econbiz.de/10009197890
Persistent link: https://www.econbiz.de/10011453775
This paper gives optimality conditions to obtain a priori precedence relationships among some of the jobs in a single machine scheduling problem so as to curtail the enumeration while using branch-and-bound technique. The objective is to minimize a quadratic (or generalized quadratic) penalty...
Persistent link: https://www.econbiz.de/10009209288
In this note, a node elimination procedure has been suggested in case the two sequences obtained by using Townsend's (Townsend, W. 1978. The single machine problem with quadratic penalty function of completion times: A branch and bound solution. Management Sci. 24 (5) 530--534.) sufficient...
Persistent link: https://www.econbiz.de/10009204278
We present a greedy heuristic for the n job/1 machine scheduling problem with precedence constraints. This method is useful whenever the manager's optimization criteria is the sum of weighted or unweighted completion times, the sum of weighted or unweighted flow times, (with or without release...