Showing 1 - 5 of 5
Nowadays railway companies are confronted with high infrastructure maintenance costs. Therefore good strategies are needed to carry out these maintenance activities in a most cost effective way. In this paper we solve the preventive maintenance scheduling problem (PMSP) using genetic algorithms,...
Persistent link: https://www.econbiz.de/10008584796
Given a set of timetabled tasks, the multi-depot vehicle scheduling problem is a well-known problem that consists of determining least-cost schedules for vehicles assigned to several depots such that each task is accomplished exactly once by a vehicle. In this paper, we propose to compare the...
Persistent link: https://www.econbiz.de/10005450847
A railway system needs a substantial amount of maintenance. To prevent unexpected breakdowns as much as possible, preventive maintenance is required. In this paper we discuss the Preventive Maintenance Scheduling Problem (PMSP), where (short) routine activities and (long) unique projects have to...
Persistent link: https://www.econbiz.de/10005256413
Inventory policies for joint remanufacturing and manufacturing have recently received much attention. Most efforts, though, were related to (optimal) policy structures and numerical optimization, rather than closed form expressions for calculating near optimal policy parameters. The focus of...
Persistent link: https://www.econbiz.de/10004991138
This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a...
Persistent link: https://www.econbiz.de/10005034769