Showing 1 - 3 of 3
In this Note we present an alternative formulation to the MRP lot sizing model of Steinberg and Napier (SN) (Steinberg, E., H. A. Napier. 1980. Optimal multi-level lot sizing for requirements planning systems. Management Sci. 26 (2) 1258--1271.). The alternative is more parsimonious and the...
Persistent link: https://www.econbiz.de/10009203934
In this Note, we address the issue of safety stock considerations in an MRP environment through the use of a single identical component as a replacement for a set of multiple components. We indicate where the results reported by Collier (Collier, David A. 1982. Aggregate safety stock levels and...
Persistent link: https://www.econbiz.de/10009204007
This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems---one in which the constraint was on shipping capability and one in which there was a final stage bottleneck...
Persistent link: https://www.econbiz.de/10009197635