Showing 1 - 2 of 2
In this paper we present a mathematical programming model for the Kanban system in a deterministic multi-stage capacitated assembly-tree-structure production setting. We discuss solution procedures to the problem and address three special cases of practical interest.
Persistent link: https://www.econbiz.de/10009214437
We consider the optimal allocation of a resource in a single-facility production environment in the presence of capacity-based economies and diseconomies of scope. This setting generalizes the usual approach to single-facility resource allocation by allowing for the effective capacity of a...
Persistent link: https://www.econbiz.de/10009197312