Showing 1 - 10 of 66
In India, the electricity systems are chronically constrained by shortage of both capital and energy resources. These result in rationing and interruptions of supply with a severely disrupted electricity usage pattern. From this background, we try to analyse the demand patterns with and without...
Persistent link: https://www.econbiz.de/10005751752
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10010304664
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011613739
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011799792
We study the consequences of a working time reduction (WTR hereafter) in an exogenous growth model with unemployment (due to efficiency wage considerations) and a renewable natural resource. The resource is an essential input whose marginal productivity is bounded by physical laws. In the...
Persistent link: https://www.econbiz.de/10012497781
Persistent link: https://www.econbiz.de/10011337823
Persistent link: https://www.econbiz.de/10010526413
Persistent link: https://www.econbiz.de/10010529010
Persistent link: https://www.econbiz.de/10009784805
Persistent link: https://www.econbiz.de/10011435785