Showing 1 - 5 of 5
Persistent link: https://www.econbiz.de/10002095648
Persistent link: https://www.econbiz.de/10002095654
In this paper we consider the problem of scheduling "n" independent fades on "m" parallel processors. Each job consists of a single operation with a specific processing time and due date. The processors are identical and the operation of the system is non-preemptive. The objective is to schedule...
Persistent link: https://www.econbiz.de/10009208485
Persistent link: https://www.econbiz.de/10003531949
Persistent link: https://www.econbiz.de/10006417624