Showing 1 - 10 of 23
Persistent link: https://www.econbiz.de/10011901705
Persistent link: https://www.econbiz.de/10009784728
Persistent link: https://www.econbiz.de/10014391952
Persistent link: https://www.econbiz.de/10014382004
Persistent link: https://www.econbiz.de/10012421924
Persistent link: https://www.econbiz.de/10012282370
Persistent link: https://www.econbiz.de/10012171994
Persistent link: https://www.econbiz.de/10010142539
The two-machine flowshop environment with sequence-independent setup times has been intensely investigated both from theoretical and practical perspectives in the scheduling literature. Nevertheless, very scant attention has been devoted to deriving effective lower bounding strategies. In this...
Persistent link: https://www.econbiz.de/10010682482
Persistent link: https://www.econbiz.de/10003771683