Showing 81 - 90 of 130
In literature, both morphological and resource-related measures are used to predict the difficulty of a project scheduling problem. Rapid progress regarding solution procedures has resulted in the development of a number of data generators in order to generate instances under a controlled design...
Persistent link: https://www.econbiz.de/10004982821
Earned value project management is a well-known management system that integrates cost, schedule and technical performance. It allows the calculation of cost and schedule variances and performance indices and forecasts of project cost and schedule duration. The earned value method provides early...
Persistent link: https://www.econbiz.de/10004982829
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems in project scheduling. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions for...
Persistent link: https://www.econbiz.de/10004982845
The scheduling of projects has gained increasing attention since the introduction of PERT and CPM. Both the scheduling literature and the software scheduling packages rely on heuristic and optimal procedures to schedule projects under various assumptions. However, there is still room for...
Persistent link: https://www.econbiz.de/10004982862
Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these projects is to maintain the continuity of work of these resources so as to...
Persistent link: https://www.econbiz.de/10004982871
It is well-known that well managed and controlled projects are more likely to be delivered on time and within budget. The construction of a (resource-feasible) baseline schedule and the follow-up during execution are primary contributors to the success or failure of a project. Earned value...
Persistent link: https://www.econbiz.de/10004982875
In this paper, we propose different complexity indicators for the well-known nurse scheduling problem (NSP). The NSP assigns nurses to shifts per day taking both hard and soft constraints into account. The objective is to maximize the nurses’ preferences and to minimize the total penalty cost...
Persistent link: https://www.econbiz.de/10004982880
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10004982884
Time/cost trade-offs in project networks have been the subject of extensive research since the development of the critical path method (CPM) in the late 50s. Time/cost behaviour in a project activity basically describes the trade-off between the duration of the activity and its amount of...
Persistent link: https://www.econbiz.de/10004982895
In this paper, an Artificial Immune System (AIS) for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project, is presented. The AIS algorithm makes use of mechanisms which are inspired on...
Persistent link: https://www.econbiz.de/10004982907