Showing 1 - 10 of 303
to document several facts about the effect of outliers on estimation and out-of-sample forecasting results using euro … estimation results. Second, these swings can be addressed by rescaling the shocks’ variance. Third, taking into account outliers …
Persistent link: https://www.econbiz.de/10013450840
Managers in the music industry closely monitor both radio airplay of an album as well as the album's sales. Their interest in radio airplay is due to the belief that airplay can increase an album’s sales. Therefore it is natural for managers to attempt to influence radio airplay so as to...
Persistent link: https://www.econbiz.de/10009441155
technology change the parameters based on time trends may be too large for long run forecasting. When there is clearly …
Persistent link: https://www.econbiz.de/10009435383
forecasting system (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply …
Persistent link: https://www.econbiz.de/10009435399
Operational systems predict the consequences of atmospheric releases of hazardous materials for real-time emergency response, pre-event planning, and post-incident assessment. Such systems provide federal, state, and local agencies, emergency planners and responders, public health officials,...
Persistent link: https://www.econbiz.de/10009435402
The reservoir technology program supports the utilization of geothermal resources through development and verification of new earth science technologies for: exploration, fluid production and injection; and prediction of reservoir lifetimes. A two-fold strategy of conducting DOE-sponsored...
Persistent link: https://www.econbiz.de/10009435410
access to state agency datasets to focus exploration efforts and to perform production forecasting, economic evaluations, and …
Persistent link: https://www.econbiz.de/10009435420
The International Human Reliability Analysis (HRA) Empirical Study is a comparative benchmark of the prediction of HRA methods to the performance of nuclear power plant crews in a control room simulator. There are a number of unique aspects to the present study that distinguish it from previous...
Persistent link: https://www.econbiz.de/10009435434
In 1991, US electric utilities spent almost $1.8 billion on demand-side management (DSM) programs. These programs cut peak demands 5% and reduced electricity sales 1% that year. Utility projections suggest that these reductions will increase to 9% and 3%, respectively, by the year 2001. However,...
Persistent link: https://www.econbiz.de/10009435446
The Waste Acceptance Criteria Forecasting and Analysis Capability System (WACFACS) is used to plan for, evaluate, and …
Persistent link: https://www.econbiz.de/10009435454