Showing 1 - 10 of 114,916
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Persistent link: https://www.econbiz.de/10011471367
Persistent link: https://www.econbiz.de/10002004757
the currency market agents. The results of our simulation seem to be in line with the theory and intuition. An advantage …
Persistent link: https://www.econbiz.de/10012016846
Persistent link: https://www.econbiz.de/10014448108
Persistent link: https://www.econbiz.de/10014448095
Persistent link: https://www.econbiz.de/10011806933
Persistent link: https://www.econbiz.de/10013462247
In 1997 two papers new applying the metaheuristics Tabu Search (TS) and Heuristic Concentration (HC) tothe p-median problem were published in consecutive volumes of the European Journal of OperationalResearch. Here we apply the method of HC some of the data sets which were used for...
Persistent link: https://www.econbiz.de/10010337322
In a conventional dial-a-ride-system passengers are moved with the same vehicle between their pickup and their drop-off location. In a dial-a-ride-system with transfer, it is possible (or even standard) that passengers change the vehicle once or several times. Transfer Scheduling Constraints...
Persistent link: https://www.econbiz.de/10011300632