Showing 1 - 10 of 827
In this paper we analyze a dynamic agency problem where contracting parties do not know the agent's future productivity … agent's second-period productivity at the end of the first period. This observation is assumed to be non … aligned with the agent's second-period productivity. On the other hand, in short-term contracts first-period effort incentives …
Persistent link: https://www.econbiz.de/10010421330
Purpose: The question of resource scarcity and emerging pressure of environmental legislations has brought a new challenge for the manufacturing industry. On the one hand, there is a huge population that demands a large quantity of commodities; on the other hand, these demands have to be met by...
Persistent link: https://www.econbiz.de/10010500504
Technological optimistic voices assume that, from a technical perspective, the IT possibilities for HRM are endless: in principal all HR processes can be supported by IT. E-HRM is the relatively new term for this IT supported HRM, especially through the use of web technology. This paper aims at...
Persistent link: https://www.econbiz.de/10010318072
Persistent link: https://www.econbiz.de/10011695624
Persistent link: https://www.econbiz.de/10011695660
Persistent link: https://www.econbiz.de/10011695661
Persistent link: https://www.econbiz.de/10011695662
Persistent link: https://www.econbiz.de/10011695753
This paper aims to formulate some principal questions which should be used as start-point for design and analysis of the performance measurement conceptual framework. The paper is based on literature study followed by analysis and generalization. It reflects the diversity of approaches to...
Persistent link: https://www.econbiz.de/10010512823
Persistent link: https://www.econbiz.de/10011601959