Showing 1 - 10 of 124,108
Zur Lösung des Economic Lot Scheduling Problems (ELSP) finden sich in der Literatur drei Ansätze mit unterschiedlich einschränkenden Annahmen: - Ansatz des gemeinsamen Produktzyklus (Common-Cycle-Approach) - Ansatz der gemeinsamen Basisperiode (Basic-Period-Approach) - Ansatz der variierenden...
Persistent link: https://www.econbiz.de/10011775508
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and...
Persistent link: https://www.econbiz.de/10011808819
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10011326945
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833
Persistent link: https://www.econbiz.de/10013279837
Persistent link: https://www.econbiz.de/10000995435
Persistent link: https://www.econbiz.de/10000875882
Persistent link: https://www.econbiz.de/10000875884
Persistent link: https://www.econbiz.de/10000951451
Persistent link: https://www.econbiz.de/10000800647