Showing 1 - 10 of 14
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358
Persistent link: https://www.econbiz.de/10009738972
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10003930858
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008906834
This paper presents an optimization-based solution approach for the dynamic multi-level capacitated lot sizing problem (MLCLSP) with positive lead times. The key idea is to solve a series of mixed-integer programs in an iterative fix-and-optimize algorithm. Each of these programs is optimized...
Persistent link: https://www.econbiz.de/10003664938
This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to...
Persistent link: https://www.econbiz.de/10003575481
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10003711685
This paper presents a generic modeling framework to simultaneously decide about production quantities and maintenance operations for a capacitated resource facing a dynamic demand for different types of products. As the resource needs to be setup for each specific type of product, a lot-sizing...
Persistent link: https://www.econbiz.de/10010239722
The transportation processes for patients, personnel, and material in large and complex maximum-care hospitals with many departments can consume significant resources and thus induce substantial logistics costs. These costs are largely determined by the allocation of the different departments...
Persistent link: https://www.econbiz.de/10010344961