Showing 1 - 10 of 26
Maros-Watampone road passes through a critical geometric conservation area where it is a barrier to the development improvement. Previous studies recommend that three proposed alternative constructions can be used: 1. Elevated Bridge, 2. Cut and Fill, 3. Tunnel system. The Government invited...
Persistent link: https://www.econbiz.de/10011547268
The evaluation of transport projects has become increasingly complex. Different aspects have to be taken into account and the consequences of the problems are usually far reaching and the different policy alternatives are numerous and difficult to predict. Several pressure or action groups have...
Persistent link: https://www.econbiz.de/10011548150
Persistent link: https://www.econbiz.de/10011665950
5G needs to be viewed as a request for network upgrade driven by demands for innovative services, not only by demands for enhanced mobile networks per se. The R&D plan of the Korean government has been discordant with the vision of 5G, maintaining the tradition of sector- or issue-based R&D...
Persistent link: https://www.econbiz.de/10011777853
Persistent link: https://www.econbiz.de/10011866207
Persistent link: https://www.econbiz.de/10010353750
Persistent link: https://www.econbiz.de/10011529129
Persistent link: https://www.econbiz.de/10011529130
Persistent link: https://www.econbiz.de/10011529670
This study aimed to suggest the standards of evaluating car navigation app by examining and categorizing app's attributes. This study suggested four main criteria for app evaluation model; Functionality, Usability, Networking ability and Additional features and three sub-criteria belonging each...
Persistent link: https://www.econbiz.de/10012004204