Persistent link: https://www.econbiz.de/10000621529
Persistent link: https://www.econbiz.de/10011735687
Since its advent, the 'just-in-time'-paradigm has considerable influence on production planning and control. While originally employed for high-volume production, 'just-in-time'-concepts are meanwhile documented for low-volume, make-to-order production as well. An example is the assembly of...
Persistent link: https://www.econbiz.de/10011736864
The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011737214
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
We review the well-known RSM priority rule to solve the resource constrained project scheduling problem. A detailed analysis of this rule reveals that it is based on assumptions which do not hold in general and hence might lead to poor solutions. Consequently, an improved RSM priority rule is...
Persistent link: https://www.econbiz.de/10011739746
Investment projects consist of activities which are interrelated by techno-logical and resource constraints. The timing of payments depends on the scheduling of the activities which is not known a priory. Hence, the decision to be made, is to find a feasible Investment schedule with maximum net...
Persistent link: https://www.econbiz.de/10011808794
Persistent link: https://www.econbiz.de/10011735568
Persistent link: https://www.econbiz.de/10011735573
Persistent link: https://www.econbiz.de/10000827496