Showing 1 - 7 of 7
As the mitigation prescribed by the Regional Act proceeds, the incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative...
Persistent link: https://www.econbiz.de/10009435605
final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund … stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10 …) experimental design and decision making with uncertainty. …
Persistent link: https://www.econbiz.de/10009435639
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based …: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a …
Persistent link: https://www.econbiz.de/10009435883
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based …: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a …
Persistent link: https://www.econbiz.de/10009435884
Project tasks: Perform the necessary testing and development to demonstrate that the amount of binder in coal logs can be reduced to 8% or lower to produce logs with adequate strength to eliminate breakage during pipeline transportation, under conditions experienced in long distance pipeline...
Persistent link: https://www.econbiz.de/10009436247
Project tasks include: (1) Perform the necessary testing and development to demonstrate that the amount of binder in coal logs can be reduced to 8% or lower to produce logs with adequate strength to eliminate breakage during pipeline transportation, under conditions experienced in long distance...
Persistent link: https://www.econbiz.de/10009436353
conceptual design for a plant to wash 25mm x 0 raw coal fines at a need rate of 300 mtph was completed. This plant will receive …
Persistent link: https://www.econbiz.de/10009436421