Showing 1 - 10 of 7,731
projects. We find that project concessions can recapture value by phasing dam build-out. Our optionality framework can help …
Persistent link: https://www.econbiz.de/10011451648
Water balances pertaining to the flux of water through the Volta River Basin and a black box model of the rainfall/runoff relationship for estimating the river flows into the Akosombo Reservoir are presented. As the water demand has approached supply, the tradeoffs between competing water uses...
Persistent link: https://www.econbiz.de/10011577554
Persistent link: https://www.econbiz.de/10012216459
removing control counties with environmental regulations. I also find small local agglomeration effects from smaller dam …
Persistent link: https://www.econbiz.de/10010339590
Persistent link: https://www.econbiz.de/10009775181
Persistent link: https://www.econbiz.de/10010362484
Persistent link: https://www.econbiz.de/10001461644
This paper assesses the economic benefits of 57 World Bank Group-sponsored hydropower dam plant investments. Hydropower …
Persistent link: https://www.econbiz.de/10012662233
Persistent link: https://www.econbiz.de/10012318633
Persistent link: https://www.econbiz.de/10011761997