Showing 131 - 140 of 309
In this paper, we consider the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. For the first time, the concept of partially renewable resources is embedded in the context of projects with general temporal constraints. While...
Persistent link: https://www.econbiz.de/10014503793
In reverse logistics networks, products (e.g., bottles or containers) have to be transported from a depot to customer locations and, after use, from customer locations back to the depot. In order to operate economically beneficial, companies prefer a simultaneous delivery and pick-up service....
Persistent link: https://www.econbiz.de/10010421381
Persistent link: https://www.econbiz.de/10003417462
Persistent link: https://www.econbiz.de/10003425835
Persistent link: https://www.econbiz.de/10011340466
Persistent link: https://www.econbiz.de/10002097043
Persistent link: https://www.econbiz.de/10001303154
In reverse logistics networks, products (e.g., bottles or containers) have to be transported from a depot to customer locations and, after use, from customer locations back to the depot. In order to operate economically beneficial, companies prefer a simultaneous delivery and pick-up service....
Persistent link: https://www.econbiz.de/10013081888
As a consequence of globalisation and increasing customer expectations, medium-sized less-than-truckload carriers operate together in cooperations. Each cooperative member faces a multitude of requirements when constructing a low-cost, feasible set of routes. Taking up this problem, we take...
Persistent link: https://www.econbiz.de/10010995031