Showing 923,171 - 923,180 of 933,991
The purpose of this paper is to analyze the influence of uncertainty on the value of real options while allowing for a possible change in the value of the underlying asset. We show that the proposition of a strictly positive influence of uncertainty does not hold, if the value of the underlying...
Persistent link: https://www.econbiz.de/10011558716
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011558725
This article examines basic features of ranked Conjoint-data, analyzes the adequacy of evaluation methods and proposes improvements for better utilizing the information provided by ranked data. It is shown that commonly used goodness-of-fit measures provide inadequate proxy measures for...
Persistent link: https://www.econbiz.de/10011558726
The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011558728
Persistent link: https://www.econbiz.de/10011558729
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558730
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558731
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
In this paper we present a polynomial time dynamic programming algorithm for solving a scheduling problem with a (total) weighted completion time objective function where the weights are activity- and time-dependent. We highlight application areas for this type of problem to underscore the...
Persistent link: https://www.econbiz.de/10011558733
Persistent link: https://www.econbiz.de/10011558734