Showing 882,181 - 882,190 of 892,325
This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewabe resources. We provide a 0-1 problem formulation and stress the importance of the outlined model by...
Persistent link: https://www.econbiz.de/10011613754
We introduce the batch sequencing problem with item and batch availability for the single machine and two machine flow-shop case. We propose a genetic algorithm which solves all variants through a decomposition of the problem into a Phase I-Batching and a Phase II-Scheduling decision. The batch...
Persistent link: https://www.econbiz.de/10011613756
theory, the comparison is based on a sound decision-theoretic framework. Additionally, we included a comprehensive assessment …
Persistent link: https://www.econbiz.de/10011613757
Die Entscheidung zwischen Eigenerstellung oder Fremdbezug bestimmter Erzeugnisse wird in der Betriebswirtschaftslehre traditionell anhand kostenorientierter Kriterien gefällt, die die Mehrkosten des Fremdbezugs betrachten. In diesem Beitrag wurde gezeigt, daß dieses Entscheidungskriterium...
Persistent link: https://www.econbiz.de/10011613759
Persistent link: https://www.econbiz.de/10011620839
Persistent link: https://www.econbiz.de/10011620844
Persistent link: https://www.econbiz.de/10011620870
Persistent link: https://www.econbiz.de/10011620871
Persistent link: https://www.econbiz.de/10011620876
Persistent link: https://www.econbiz.de/10011620879