Showing 41 - 50 of 19,131
In regression discontinuity design (RD), for a given bandwidth, researchers can estimate standard errors based on different variance formulas obtained under different asymptotic frameworks. In the traditional approach the bandwidth shrinks to zero as sample size increases; alternatively, the...
Persistent link: https://www.econbiz.de/10011869057
Persistent link: https://www.econbiz.de/10011882668
Persistent link: https://www.econbiz.de/10011907859
Persistent link: https://www.econbiz.de/10011917748
Persistent link: https://www.econbiz.de/10011960883
Persistent link: https://www.econbiz.de/10011944468
The chain ladder method is a popular technique to estimate the future reserves needed to handle claims that are not fully settled. Since the predictions of the aggregate portfolio (consisting of different subportfolios) do not need to be equal to the sum of the predictions of the subportfolios,...
Persistent link: https://www.econbiz.de/10011906200
Persistent link: https://www.econbiz.de/10011490577
Persistent link: https://www.econbiz.de/10010485679
Persistent link: https://www.econbiz.de/10010485680