Showing 1 - 10 of 650
This paper deals with automated guided vehicles (AGVs) which transport containers between the quai and the stack on automated container terminals. The focus is on the assigment of transportation jobs to AGVs within a terminal control system operating in real time. First, we describe a rather...
Persistent link: https://www.econbiz.de/10011724112
Persistent link: https://www.econbiz.de/10003224703
Persistent link: https://www.econbiz.de/10000620290
Persistent link: https://www.econbiz.de/10001224049
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239
Persistent link: https://www.econbiz.de/10011735579
This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature,...
Persistent link: https://www.econbiz.de/10011736626
Persistent link: https://www.econbiz.de/10011293416
Persistent link: https://www.econbiz.de/10003996698
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10008992371