Showing 1 - 10 of 88
Persistent link: https://www.econbiz.de/10003679626
Persistent link: https://www.econbiz.de/10001015620
Persistent link: https://www.econbiz.de/10005257147
The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time...
Persistent link: https://www.econbiz.de/10009204187
In this paper we consider a class of job shops with a dispatch area and a machine shop, where operational controls are exercised at the dispatch area as well as at the machine shop. For such dynamic job shops with these two levels of control, there are three categories of models. They are (1)...
Persistent link: https://www.econbiz.de/10009204560
Persistent link: https://www.econbiz.de/10001013665
Persistent link: https://www.econbiz.de/10003679637
Persistent link: https://www.econbiz.de/10003679641
Persistent link: https://www.econbiz.de/10003679647
Persistent link: https://www.econbiz.de/10004788744