We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011613743
In machine tool assembly several make-to-order products have to be manufactured simultaneously in a multi-stage production system. Due to customer requirements batches are very small. A process plan specifies the neccessary machines, tools, auxiliary devices as well as the operations to be...
Persistent link: https://www.econbiz.de/10011613744
This contribution presents two heuristic approaches for multi-level, single-machine lot sizing and scheduling. The first one is a variant of a so-called randomized regret based heuristic which is assumed to be the fastest available method for this particular class of problems. The second...
Persistent link: https://www.econbiz.de/10011613745
Verschiedene Prognosen weisen darauf hin, daß das Markenwertkonzept zu den einflußreichsten Themen der nächsten zehn Jahre innerhalb des Marketings werden wird. Die hier präsentierte Studie untersucht zunächst, für welche Zwecke der Markenwert verwendet werden kann und welche Anforderungen...
Persistent link: https://www.econbiz.de/10011613746
We review the well-known RSM priority rule to solve the resource constrained project scheduling problem. A detailed analysis of this rule reveals that it is based on assumptions which do not hold in general and hence might lead to poor solutions. Consequently, an improved RSM priority rule is...
Persistent link: https://www.econbiz.de/10011613747
This contribution deals with dynamic, capacitated, multi-level lot sizing and scheduling. The basic assumption is that for each item there is exactly one machine that this item can be manufactured on but no two items share a common machine. Finding an optimal solution with a greedy algorithm...
Persistent link: https://www.econbiz.de/10011613748
In this paper we propose a new heuristic to solve the well-known multiple resource-constrained project scheduling problem. The method is basically a biased random sampling procedure which shows extremely good results by use of the following features: A problem-based selection of the solution...
Persistent link: https://www.econbiz.de/10011613750
This contribution acquaints the reader with a model for multi-level single-machine proportional lot sizing and scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first papers that deals with dynamic capacitated multi-level lot sizing and...
Persistent link: https://www.econbiz.de/10011613751
Based upon an empirical survey among the 200 biggest CPA firms in Germany an hierarchical modeling framework for audit-staff scheduling with three levels has been developed. For the second level, the so-called medium-to-short-term planning, a binary optimization model is introduced which is...
Persistent link: https://www.econbiz.de/10011613752
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753