Showing 1 - 10 of 55
Persistent link: https://www.econbiz.de/10008261985
This paper presents branch-and-bound algorithms developed for an m-machine permutation flowshop to minimise the maximum weighted flowtime/maximum weighted tardiness/maximum sum of weighted flowtime and weighted tardiness/maximum sum of weighted flowtime, weighted tardiness and weighted earliness...
Persistent link: https://www.econbiz.de/10009352917
Persistent link: https://www.econbiz.de/10009489205
Persistent link: https://www.econbiz.de/10010248552
Persistent link: https://www.econbiz.de/10009882603
Persistent link: https://www.econbiz.de/10001256400
Persistent link: https://www.econbiz.de/10003594666
Persistent link: https://www.econbiz.de/10003594689
Evaluating the hazard potential of the Makran subduction zone requires understanding the previous records of the large earthquakes and tsunamis. We address this problem by searching for earthquake and tectonic proxies along the Makran Coast and linking those observations with the available...
Persistent link: https://www.econbiz.de/10010996128