We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various case-specific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10005607038
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10005607039
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-)...
Persistent link: https://www.econbiz.de/10005464791
The well-known resource-constrained project scheduling problem (RCPSP) schedules project activities within the precedence and renewable resource constraints while minimizing the total lead-time of the project. The basic problem description assumes non-pre-emptive activities with fixed durations,...
Persistent link: https://www.econbiz.de/10005464809
In literature, both morphological and resource-related measures are used to predict the difficulty of a project scheduling problem. Rapid progress regarding solution procedures has resulted in the development of a number of data generators in order to generate instances under a controlled design...
Persistent link: https://www.econbiz.de/10004982821
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems in project scheduling. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions for...
Persistent link: https://www.econbiz.de/10004982845
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10004982884
Time/cost trade-offs in project networks have been the subject of extensive research since the development of the critical path method (CPM) in the late 50s. Time/cost behaviour in a project activity basically describes the trade-off between the duration of the activity and its amount of...
Persistent link: https://www.econbiz.de/10004982895
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-)...
Persistent link: https://www.econbiz.de/10004982948
We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various casespecific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10004982974