Showing 1 - 10 of 652,704
The paper is concerned with the problem of optimal production planning in deterministic pull flow lines with multiple products. The objective is to specify the production policy that minimizes the total inventory and backlog costs overtime. Assuming constant product demands and non-decreasing...
Persistent link: https://www.econbiz.de/10012772150
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10013127286
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and...
Persistent link: https://www.econbiz.de/10012835295
This paper is concerned with an asymptotic analysis of hierarchical production planning in a stochastic manufacturing system consisting of machines that are subject to breakdown and repair. The system produces a single product whose rate of demand over time is constant. The problem is formulated...
Persistent link: https://www.econbiz.de/10014047633
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10011326945
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10014033650
The allocation of buffer space in flow lines with stochastic processing times is an important decision, as buffer capacities influence the performance of these lines. The objective of this problem is to minimize the overall number of buffer spaces achieving at least one given goal production...
Persistent link: https://www.econbiz.de/10014149181
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
This paper summarizes the results of its detailed version, which considers optimal infinite horizon stochastic production planning problems with capacity and demand to be finite state Markov chains. Turnpike set concepts are introduced to characterize the optimal inventory levels. It is shown...
Persistent link: https://www.econbiz.de/10012834925
This paper considers the production planning problem of a firm that produces a single product using a process that has multiple production lines (or machines) in parallel, each with a finite production capacity. Specifically, the firm has m parallel production lines, each with capacity of P...
Persistent link: https://www.econbiz.de/10012838802