Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10004771583
During project execution, the status of the project is periodically evaluated, usingtraditional methods or standard practices. However, these traditional methods orstandard practices may not adequately identify certain issues, such as lack of sufficientidentification of warning signs that...
Persistent link: https://www.econbiz.de/10009464839
Availability of historical unit cost data is an important factor in developing accurate project cost estimates. State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, material costs, and equipment costs, including contractor overhead and...
Persistent link: https://www.econbiz.de/10009464964
Persistent link: https://www.econbiz.de/10004249974
Persistent link: https://www.econbiz.de/10004326301
Persistent link: https://www.econbiz.de/10004140773
Persistent link: https://www.econbiz.de/10003998167
Persistent link: https://www.econbiz.de/10004015580