This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MMRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and...
Persistent link: https://www.econbiz.de/10008468958
In the past decades, resource parameters have been introduced in project scheduling literature to measure the scarceness of resources of a project instance. In this paper, we use these resource scarceness parameters to differentiate in the search process needed to solve the multi-mode resource...
Persistent link: https://www.econbiz.de/10005007707
Persistent link: https://www.econbiz.de/10011417450
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Persistent link: https://www.econbiz.de/10011859810
The project portfolio scheduling problem has become very popular in recent years since many modern organizations operate in multi-project and multi-objective environment. Current project oriented organizations have to design a plan in order to execute a set of projects sharing common resources...
Persistent link: https://www.econbiz.de/10012046673
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011324714
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011558747
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011776698
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10012502870