Showing 91 - 100 of 17,732
A basic modular exploration sequence which includes a carefully balanced selection of geological, geochemical, and geophysical modules is developed for geothermal prospecting in the eastern Basin and Range. The cost per square mile for application of this exploration architecture is $461.00. If...
Persistent link: https://www.econbiz.de/10009435837
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results...
Persistent link: https://www.econbiz.de/10009435883
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results...
Persistent link: https://www.econbiz.de/10009435884
This report reviews recent DSM shareholder incentive designs and performance at 10 US utilities identifies opportunities for regulators to improve the design of DSM shareholder incentive mechanisms to increase the procurement of cost-effective DSM resources. We develop six recommendations: (1)...
Persistent link: https://www.econbiz.de/10009435891
This paper compares the financing costs of wind turbine powerplants with those of fossil powerplants. The goal of this examination is to determine the extent to which these costs differ and what the sources of such differences may be. The discussion is organized in the following fashion. Section...
Persistent link: https://www.econbiz.de/10009435892
The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will...
Persistent link: https://www.econbiz.de/10009435902
Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it...
Persistent link: https://www.econbiz.de/10009435904
The Energy Policy Act of 1992 establishes a program to support development of renewable energy technologies including a production incentive to public power utilities. Because there is a wide range of possible policy actions that could be taken to increase electric market share for renewables,...
Persistent link: https://www.econbiz.de/10009435914
The Energy Policy Act of 1992 establishes a program to support development of renewable energy technologies including a production incentive to public power utilities. Because there is a wide range of possible policy actions that could be taken to increase electric market share for renewables,...
Persistent link: https://www.econbiz.de/10009435915
Net income for 259 energy companies-- including, 20 major US petroleum companies-- rose 38 percent between the first quarter of 1992 and the first quarter of 1993. An increased level of economic activity, along with colder weather, helped lift the demand for natural gas. crude oil, coal, and...
Persistent link: https://www.econbiz.de/10009435929