Yan, Changyuan; Liao, Yi; Banerjee, Avijit - In: Omega 41 (2013) 3, pp. 510-516
In this paper, we revisit the economic lot scheduling problem (ELSP), where a family of products is produced on a single machine, or facility, on a continual basis. Our focus is on the determination of a feasible production schedule, including the manufacturing batch size of each item. We assume...