Showing 1 - 10 of 342
An alternative heuristic method for scheduling repetitive projects in which resources are limited and activities may be executed with multiple modes of resource demands associated with different durations is proposed. Unlike general heuristic methods that separately analyze each competing...
Persistent link: https://www.econbiz.de/10005482401
Persistent link: https://www.econbiz.de/10006158212
Persistent link: https://www.econbiz.de/10006158640
Persistent link: https://www.econbiz.de/10006641567
Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various...
Persistent link: https://www.econbiz.de/10008603277
Persistent link: https://www.econbiz.de/10003796297
Persistent link: https://www.econbiz.de/10009507312
Persistent link: https://www.econbiz.de/10009507323
Persistent link: https://www.econbiz.de/10009507324
Persistent link: https://www.econbiz.de/10011486960