Showing 1 - 10 of 26
Persistent link: https://www.econbiz.de/10003380322
Persistent link: https://www.econbiz.de/10005311880
Persistent link: https://www.econbiz.de/10005318407
Persistent link: https://www.econbiz.de/10005318514
Persistent link: https://www.econbiz.de/10005318574
Persistent link: https://www.econbiz.de/10005340073
The paper presents a heuristic for resource constrained network project scheduling. A network project comprising both alternative deterministic decision nodes and alternative branching nodes with probabilistic outcomes is considered. Several renewable activity related resources, such as machines...
Persistent link: https://www.econbiz.de/10010750043
We are concerned with a problem of scheduling a flexible manufacturing cell with random time operations. A job-shop production section comprises a set of n jobs (orders) and a set of m machines (processors). Each order consists of a chain of operations, each of which needs to be executed during...
Persistent link: https://www.econbiz.de/10010870079
Persistent link: https://www.econbiz.de/10006269825
Persistent link: https://www.econbiz.de/10006305991