Showing 71 - 80 of 277
) using Bayesian networks for estimating human risks due to dam-break floods. A Bayesian network is constructed according to a …
Persistent link: https://www.econbiz.de/10010996285
The Tangjiashan landslide dam was formed during the Ms8.0 Wenchuan earthquake in 2008 and posed high risks to 1.2 million people downstream the dam. A human risk analysis model (HURAM) reported in the companion paper is applied to evaluate the human risk in the Tangjiashan landslide dam...
Persistent link: https://www.econbiz.de/10010996326
Urban floods are sudden phenomena normally characterized by short flooding durations and devastating effects due to the …
Persistent link: https://www.econbiz.de/10010996502
events have included the severe 1997/98 ElNiño (with its near-global impacts), HurricaneMitch, and floods in China in mid …
Persistent link: https://www.econbiz.de/10010996525
discharge conditions and floods. The investigations are focussed on the major part of the German Rhine catchment with a drainage … conclusions to be drawn on the development of future extreme floods. Copyright Springer 2006 …
Persistent link: https://www.econbiz.de/10010996598
With the recent transition to a more risk-based approach in flood management, flood risk models—being a key component in flood risk management—are becoming increasingly important. Such models combine information from four components: (1) the flood hazard (mostly inundation depth), (2) the...
Persistent link: https://www.econbiz.de/10010996618
During the Mitch Hurricane event (October 1998), severe floods occurred in the village of La Trinidad (Departamento de …
Persistent link: https://www.econbiz.de/10010996800
This paper develops a view of vulnerability attempting to capture a constitutive dimension of most disasters, that is their radically surprising moment. Therefore, it builds a conceptual framework, which captures the moment of surprise itself, as well as, its consequences for people by...
Persistent link: https://www.econbiz.de/10010996896
plans for floods. To assess the flood emergency plans, 22 metrics were developed. These metrics covered a range of issues … floods on critical infrastructure can be considerably improved. The main challenge for emergency planners is to avoid filling …
Persistent link: https://www.econbiz.de/10010996923
The past decade has seen an increase in the number of significant natural disasters that have caused considerable loss of life as well as damage to all property markets in the affected areas. In many cases, these natural disasters have not only caused significant property damage, but in numerous...
Persistent link: https://www.econbiz.de/10010996982