Construction site layout decisions affect the effort involved in materials handling, an activity which occupies a substantial portion of working time. Much computer software has been developed enabling construction managers to plan and visualize the layout of a construction site, but at present...
Persistent link: https://www.econbiz.de/10009277635
The just-in-time (JIT) philosophy has been used in the manufacturing industry for some forty to fifty years. This system increased not only the productivity of the industry but also the quality of its products. Explorative studies have been completed in recent years to see how JIT can be applied...
Persistent link: https://www.econbiz.de/10005438544
A good site layout is vital to ensure the safety of the working environment, and for effective and efficient operations. Moreover, it minimizes travel distance, decreases materials handling, and avoids the obstruction of materials and plant movement. Based on studies in the manufacturing...
Persistent link: https://www.econbiz.de/10005438559
Persistent link: https://www.econbiz.de/10012625908
Persistent link: https://www.econbiz.de/10012495441
Persistent link: https://www.econbiz.de/10014548033
Material transportation for high-rise building construction relies heavily on tower cranes. Hence the proper use of tower cranes is of paramount importance for high-rise residential building construction. In planning and monitoring crane usage in Hong Kong, a schedule is usually prepared to...
Persistent link: https://www.econbiz.de/10005633105
Several approaches for subset recovery and improved forecasting accuracy have been proposed and studied. One way is to apply a regularization strategy and solve the model selection task as a continuous optimization problem. One of the most popular approaches in this research field is given by...
Persistent link: https://www.econbiz.de/10010291802
We develop a hybrid algorithm using Genetic Algorithms (GA) and Simulated Annealing (SA) to solve multi-objective step function maximization problems. We then apply the algorithm to a specific economic problem which is taken out of the corporate governance literature.
Persistent link: https://www.econbiz.de/10010292753
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010294420