Showing 1 - 10 of 40,487
The briefing process is critical to the successful delivery of construction projects. Although a number of briefing … guides have been developed, attempting to address the problems of briefing, they are often criticized as being too general … the briefing process. It integrates the value management (VM) methodology with function analysis system technique (FAST …
Persistent link: https://www.econbiz.de/10005482571
Persistent link: https://www.econbiz.de/10010229287
Persistent link: https://www.econbiz.de/10003789245
Persistent link: https://www.econbiz.de/10010461257
The main idea of current PhD thesis is the analysis of bank value and risk interdependence, and that bank value is conected with bank activity riskiness on consistent pattern and that this dependency is advisable to measure on probability basis with simulation modeling. In the work are presented...
Persistent link: https://www.econbiz.de/10009479231
Disertacijoje nagrinėjamos banko vertės ir rizikos sąveikos problemos, ginama tezė, kad banko vertė susijusi su banko veiklos rizikų portfeliu dėsningai ir kad šią priklausomybę tikslinga matuoti per tikimybės ir patikimumo prizmes imitavimo būdu. Darbe pateikiamas susistemintas...
Persistent link: https://www.econbiz.de/10009479232
Persistent link: https://www.econbiz.de/10003740714
Persistent link: https://www.econbiz.de/10003377610
Persistent link: https://www.econbiz.de/10008669605