Wazed, Md. Abdul; Ahmed, Shamsuddin; Nukman, Yusoff - In: European Journal of Industrial Engineering 5 (2011) 2, pp. 215-231
The work desires: 1) to determine the optimum level of batch size in bottleneck facility; 2) to analyse the effect of common processes on throughput and cycle time in a multistage production system under machine breakdown and quality uncertainty. In this research, the authors developed...