Showing 21 - 30 of 32,839
Persistent link: https://www.econbiz.de/10011408358
Persistent link: https://www.econbiz.de/10011778768
Persistent link: https://www.econbiz.de/10011654574
We develop a new quantile-based panel data framework to study the nature of income persistence and the transmission of income shocks to consumption. Log-earnings are the sum of a general Markovian persistent component and a transitory innovation. The persistence of past shocks to earnings is...
Persistent link: https://www.econbiz.de/10011345793
This paper constructs estimators for panel data regression models with individual specific heterogeneity and two-sided censoring and truncation. Following Powell (1986) the estimation strategy is based on moment conditions constructed from re-censored or re-truncated residuals. While these...
Persistent link: https://www.econbiz.de/10010292198
Abstract This paper constructs estimators for panel data regression models with individual specific heterogeneity and two-sided censoring and truncation. Following Powell the estimation strategy is based on moment conditions constructed from re-censored or re-truncated residuals. While these...
Persistent link: https://www.econbiz.de/10014612553
We investigate the finite sample performance of several estimators proposed for the panel data Tobit regression model with individual effects, including Honor¨¦ estimator, Hansen¡¯s best two-step GMM estimator, the continuously updating GMM estimator, and the empirical likelihood estimator...
Persistent link: https://www.econbiz.de/10010888574
We compare the short- and the long-run consequences of Russia's Energy Strategy to 2020 and of the project of the Strategy to 2030 with a hypothetical scenario of the weak-sustainable oil extraction, starting from 2008 and providing asymptotically constant per capita consumption in the long run....
Persistent link: https://www.econbiz.de/10015216797
Establishing realistic project plans and completing the resulting business projects on schedule is crucial for organizations striving to effectively utilize their resources. However, incentivizing on-time project delivery may introduce moral hazard, as people may respond to estimation accuracy...
Persistent link: https://www.econbiz.de/10015219445
How to avoid project failures driven by overoptimistic schedules? Managers often attempt to mitigate the duration underestimation and improve the accuracy of project schedules by providing their planners with excessively detailed project specifications. While this traditional approach may be...
Persistent link: https://www.econbiz.de/10015220611