Showing 1 - 10 of 266
Persistent link: https://www.econbiz.de/10005207497
Persistent link: https://www.econbiz.de/10005474858
Persistent link: https://www.econbiz.de/10005474859
Persistent link: https://www.econbiz.de/10005625194
Persistent link: https://www.econbiz.de/10005474865
In this paper, the problem of integrating vehicle and crew scheduling is considered. Traditionally, vehicle and crew scheduling have been dealt with in a sequential manner, were vehicle schedules are determined before the crew schedules. The few papers that appeared in the literature have in...
Persistent link: https://www.econbiz.de/10005660873
In this paper we consider the two-machine ow shop problem with varying machine speeds. We present an algorithm which determines the optimal permutations for all machine speeds in O ( n log n ) time, where n is the number of jobs. To achieve this bound on the running time, the algorithm employs...
Persistent link: https://www.econbiz.de/10005304803
Persistent link: https://www.econbiz.de/10005240285
Persistent link: https://www.econbiz.de/10006661947
We study a class of scheduling problems involving the maximumlateness criterion and an element of batching. For all the problemsthat we examine, algorithms appear in the literature which consistof a sorting step to determine an optimal job sequence, followedby a dynamic programming step which...
Persistent link: https://www.econbiz.de/10010324684