Showing 81 - 90 of 137
Persistent link: https://www.econbiz.de/10007398513
A Delphic study investigating the perceived relationship between 20 contractor selection criteria (CSC) currently in use and project success factors (PSFs) in terms of time, cost and quality is described involving a sample of eight experienced construction personnel, including two validators. A...
Persistent link: https://www.econbiz.de/10009277636
Persistent link: https://www.econbiz.de/10009277640
In statistical analysis of intertemporal movements in time-cost relationships via the Bromilow model it is shown that for Ng et al.'s (2001) Australian data, the K value is not significantly different from unity. This is utilized to develop a new and simpler ratio measure of the time-cost...
Persistent link: https://www.econbiz.de/10009277647
A method for analysing the competitiveness of a consultant's two-envelope fee tendering history is proposed and illustrated in an application to one of Hong Kong's larger quantity surveying practices. Separate measures for determining consultants' fee, quality score and overall competitiveness...
Persistent link: https://www.econbiz.de/10009277911
Persistent link: https://www.econbiz.de/10006162265
Persistent link: https://www.econbiz.de/10006166954
Persistent link: https://www.econbiz.de/10006994018
Persistent link: https://www.econbiz.de/10006765801
Persistent link: https://www.econbiz.de/10014232084