Chandrasekaran, C.; Rajendran, Chandrasekharan; Chetty, … - In: European Journal of Industrial Engineering 1 (2007) 2, pp. 152-181
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying lot-sizes approach … is to minimise the long-run average inventory carrying cost and setup costs of products. While the frequency of …. Three metaheuristics, namely, a Genetic Algorithm (GA), a Simulated-annealing Algorithm (SA) and an Ant-Colony Algorithm …