Showing 1 - 10 of 404
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10010264947
Persistent link: https://www.econbiz.de/10008859911
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10003711685
Persistent link: https://www.econbiz.de/10003844541
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10005464735
We present a stochastic version of the single-level, multi-product dynamic lotsizingproblem subject to a capacity constraint. A production schedule has tobe determined for random demand so that expected costs are minimized and aconstraint based on a new backlog-oriented Sigma-service-level...
Persistent link: https://www.econbiz.de/10009302596
This paper presents an optimization-based solution approach for the dynamicmulti-level capacitated lot sizing problem (MLCLSP) with positive leadtimes. The key idea is to solve a series of mixed-integer programs in an iterativefix-and-optimize algorithm. Each of these programs is optimized over...
Persistent link: https://www.econbiz.de/10005867423
This paper treats the problem of setting the inventory level of closed-loop owlines operating under the constant-work-in-process (CONWIP) protocol. We solve ahuge but simple linear program that models an entire simulation run of a closed-loopow line in discrete time to determine a production...
Persistent link: https://www.econbiz.de/10005870770
We present a detailed analysis of the patient and resource scheduling problemin rehabilitation hospitals. In practice, the predominantly therapeutical treatmentsand activities which are prescribed for the patients are typically scheduled manually.This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10009302603
This paper presents a linear programming approach to analyze and optimizeow lines with limited buer capacities and stochastic processing times. The basic ideais to solve a huge but simple linear program that models an entire simulation run of amulti-stage production process in discrete time, to...
Persistent link: https://www.econbiz.de/10005867427