Showing 1 - 10 of 159
Persistent link: https://www.econbiz.de/10011283733
Persistent link: https://www.econbiz.de/10011906877
Persistent link: https://www.econbiz.de/10008845014
In this paper we study the integration of production, transportation and storage decisions in a multi plant-distribution center supply chain structure. Multiple plants produce one type of item, each of them with different production capacity and costs, and send finished goods to the distribution...
Persistent link: https://www.econbiz.de/10014224533
In this paper, we study a special case of the capacitated lot sizing problem (CLSP), where alternative machines are used for the production of a single-item. The production cost on each machine is assumed to be piece-wise linear with discontinuous steps (step-wise costs). The over-produced...
Persistent link: https://www.econbiz.de/10005066897
In this paper we study the integration of production, transportation and storage decisions in a multi plant-distribution center supply structure. Multiple plants produce one type of item, each of them with different production capacity and costs, and send finished goods to the distribution...
Persistent link: https://www.econbiz.de/10005043198
Persistent link: https://www.econbiz.de/10003852136
Persistent link: https://www.econbiz.de/10009757988
Persistent link: https://www.econbiz.de/10009613785
Persistent link: https://www.econbiz.de/10003628230