Showing 1 - 10 of 117
We consider the planning of production over the infinite horizon in a system with time-varying convex production and inventory holding costs. This production lot size problem is frequently faced in industry where a forecast of future demand must be made and production is to be scheduled based on...
Persistent link: https://www.econbiz.de/10009214894
Persistent link: https://www.econbiz.de/10003682389
Persistent link: https://www.econbiz.de/10003682523
Persistent link: https://www.econbiz.de/10002819388
Persistent link: https://www.econbiz.de/10002819393
Persistent link: https://www.econbiz.de/10012283830
We consider a make-to-order production system where two major components, one nonperishable (referred to as part 1) and one perishable (part 2), are needed to fulfill a customer order. In each period, replenishment decisions for both parts need to be made jointly before demand is realized and a...
Persistent link: https://www.econbiz.de/10009476548
Persistent link: https://www.econbiz.de/10003451591
Persistent link: https://www.econbiz.de/10009501733
Persistent link: https://www.econbiz.de/10010519496