Showing 11 - 20 of 346
This paper presents a preliminary analysis of the typical scheduling environment in semiconductor manufacturing involving multiple job families, and where more than one objective such as cycle time, machine utilization and the due-date accuracy needs to be simultaneously considered. In this...
Persistent link: https://www.econbiz.de/10005333975
Persistent link: https://www.econbiz.de/10005081974
Persistent link: https://www.econbiz.de/10007321408
Persistent link: https://www.econbiz.de/10007286029
Persistent link: https://www.econbiz.de/10006550169
Persistent link: https://www.econbiz.de/10006550710
Persistent link: https://www.econbiz.de/10006563216
Persistent link: https://www.econbiz.de/10006571729
Persistent link: https://www.econbiz.de/10006573458
Persistent link: https://www.econbiz.de/10006630732