Showing 1 - 10 of 62
Persistent link: https://www.econbiz.de/10003888388
In this paper, we consider the lot-streaming problem of sequencing a set of batches, to be processed in equal sublots, in a flow-shop, so as to minimize makespan. A new heuristic procedure, called the bottleneck minimal idleness heuristic, is developed. Results of an experimental study are...
Persistent link: https://www.econbiz.de/10005334001
Persistent link: https://www.econbiz.de/10008422923
Persistent link: https://www.econbiz.de/10007991321
Persistent link: https://www.econbiz.de/10008898922
The inter-departure time variability is an important measure in production lines. Higher variability means added work-in-process and less predictability in output. It can be a primary obstacle towards achieving on-time delivery. The effects of line parameters (e.g., line length or buffer...
Persistent link: https://www.econbiz.de/10005066856
Lot streaming is the process of splitting a production lot into sublots, and then, scheduling the sublots in an overlapping fashion on the machines. In this paper, we present a polynomial-time procedure for determining the number of sublots of a single-lot, multiple-machine flow shop...
Persistent link: https://www.econbiz.de/10005414162
Persistent link: https://www.econbiz.de/10005417984
Persistent link: https://www.econbiz.de/10008283553
Persistent link: https://www.econbiz.de/10011879788