Showing 1 - 10 of 77
Persistent link: https://www.econbiz.de/10008218926
The problem of scheduling the production of new and recoverable defective items of the same product manufactured on the same facility is studied. Items are processed in batches. Each batch comprises two sub-batches processed consecutively. In the first sub-batch, all the items are newly...
Persistent link: https://www.econbiz.de/10005240354
Persistent link: https://www.econbiz.de/10006166984
Persistent link: https://www.econbiz.de/10006210755
Persistent link: https://www.econbiz.de/10006064118
Persistent link: https://www.econbiz.de/10006028918
Persistent link: https://www.econbiz.de/10006631635
Persistent link: https://www.econbiz.de/10006632277
Persistent link: https://www.econbiz.de/10006647323
Persistent link: https://www.econbiz.de/10006859327